We ordered a new tramp as the old one was falling apart. Kirk did most of the install even though it was mostly weaving. I did get to help some but certainly not half of the job.
Right side is new left side is old
Close up of the old tramp. Check out the edges. Nasty
Close up of the new.... so pretty and such fancy weaving it into place. We used the spare halyard to put tension on the cording to get it tight. Massive tension on the cording.
Mr. Fix-it transformed to Mr. Tramp Installer
The master weaver
Waaalaaaaa All Done and so pretty
Good job!!'
ReplyDelete